Model: HID-CE-200
Working area Balikpapan, Indonesia
Working purpose Construction of coal mine tailing lake, construction period of one year, to remove silt and slag in the tailing lake.
The owner's engineering environment is very difficult. Our patented product New Mud King, using the advantage of walking alone, successfully overcomes the problem of difficult access to equipment at the customer's construction site.
For sludge that needs to be cleaned, our product can use a suction pump to suck the sludge, or use a backhoe bucket to dredge. So far, the customer has been equipped with 1,000 meters of pumping mud pipeline. According to the current work efficiency, the project will be completed ahead of schedule and customer satisfaction will be high.
Parameters:
Flow capcity: 600m³H
Dredging depth: 6.0M
Discharge distance: 1000M
Hydraulic system: Rexroth, Germany
Cummins main engine: 194KW/2000RPM
Delivery method: 1 flat rack and 1 container